During reconstruction, all surfaces were stripped. Fortunately, the ceiling and its decorative painted plaster scroll detail/ crown molding resisted mold, and was saved. Innumerable layers of paint were scraped from the walls until the bare plaster was revealed before refinishing began. The entire house was treated for mold remediation.
During reconstruction